Equipment for AI data centre campuses
MV and LV distribution, UPS, busway, standby generation and liquid cooling, supplied as single items or as coordinated packages from the campus substation secondary to the rack.
The problem we solve
AI campuses are being scheduled around equipment lead times rather than construction. Switchgear, transformers and E-houses are usually the longest-lead items, and cooling is catching up as rack densities rise.
We give your procurement team a second source for the long-lead scope, with certification worked out before the order is placed.
Power
- MV distribution: metal-clad switchgear, ring main units and pad-mount transformers
- Modular power: E-houses and power skids with factory-integrated MV/LV switchgear, protection and controls
- LV distribution: 480V switchboards and switchgear
- UPS and protection: modular and standalone UPS, ACBs, MCCBs and control components
- Rack distribution: LV busway, plug-in units and tap-off boxes
- Standby generation: diesel and gas gensets with paralleling controls
Cooling
- Liquid cooling: rack, row and room CDUs, manifolds, cold-plate and immersion infrastructure
- Heat rejection: chillers, dry coolers and dual-source modules
One schedule, one supplier
Buying distribution, UPS, busway and cooling from one source means the interfaces between them are coordinated before shipment. Every package comes with a configuration-specific equipment list, a code and certification matrix, an interface schedule and an agreed FAT and commissioning scope.
Canada and US
We supply campus and behind-the-meter scope in both countries. For Canadian projects, we can also supply the utility-side substation and interconnect equipment.
Building on a fixed energization date?
Send the equipment schedule and target dates. We'll come back with what can meet them.
Send your equipment schedule